The first Grow out Tank has been successfully erected. It was last week the work began to build the Tank, although work and preparations started last month to make sure everything went smoothly. Which it did, it took less than 4 days to assemble.
In total, there will be eight tanks erected this summer and fall. The tanks are designed by A Consult who also are in charge of the installation.